Rowell Highway Power Station fire system
The Rowell Highway Power Station assignment covered a new fire-suppression system for the island’s main generators. Design and installation included two 220 kL water tanks, pumps, a booster station and associated electrical controls. The system was installed for South32 Gemco Manganese Mine.
