Didipio Underground Mine Recovery and Dewatering
Severe typhoon and rainfall events flooded Didipio’s underground mine in the Philippines in November 2024. From March to October 2025, EPC led engineers, specialists, contractors and pumping crews to dewater the mine and progressively restore access. The work also involved managing installation and commissioning of two underground borefield pumps and coordinating investigations into premature pump failures.
Didipio New 25 MVA Substation Design and Construction
EPC is providing overall project management for the delivery of a new 25 MVA substation to support Didipio’s underground mining operations and meet current and forecast power demand. EPC’s responsibilities include coordinating engineering design, managing specialist consultants, overseeing procurement and contractor engagement, and managing project delivery through construction and commissioning.
The project includes a new HV switchyard, switchroom and 25 MVA transformer, together with a 6 MVAr power factor correction system incorporating detuned reactors to mitigate 5th and 7th harmonic distortion. EPC is overseeing the technical specifications, design and construction tender packages, procurement and contractor interfaces to ensure the project meets operational, technical, budget and schedule requirements.
Didipio Backup Power Generation
EPC is providing project management and engineering support for the expansion of Didipio’s backup power generation capacity from 14 to 16 × 1.3 MW generators, increasing total installed capacity to approximately 20.8 MW. Responsibilities include coordinating engineering design, managing equipment procurement, overseeing installation planning and supporting integration with the mine’s existing HV power infrastructure.
Separately, EPC is managing the engineering design and procurement of a replacement main camp generator to address existing capacity limitations and accommodate future demand. Both projects are progressing through engineering, procurement and implementation planning to improve power supply reliability and operational resilience.
Didipio Secondary Ventilation and Ventilation-on-Demand
EPC is providing electrical engineering and project management support for the implementation of secondary ventilation and ventilation-on-demand systems across Didipio’s underground mine levels, from 2430 to 2160. Responsibilities include coordinating electrical design, overseeing the integration of power, controls and communications infrastructure, and managing interfaces with existing mine systems.
EPC is also overseeing engineering for containerised variable speed drives and has influenced procurement towards ultra-low harmonic drives to minimise harmonic distortion. Additionally, EPC has identified and is progressing a cost-saving opportunity to retrofit existing 150 kW ventilation fans for variable speed operation, reducing the need for replacement equipment. The project remains in progress, with EPC supporting engineering, procurement and implementation activities.
Reefton Restoration Project
EPC provided project management services over a three-year period for the rehabilitation of the Globe Progress Gold Mine on New Zealand’s South Island. EPC managed a small site-based team responsible for coordinating and executing mine closure and rehabilitation activities, including the development and construction of a passive water treatment system, rehabilitation of the tailings storage facility, progressive removal of the gold processing plant, and associated civil and environmental works.
Responsibilities included managing engineering, contractors, procurement, budgets, schedules and site operations, with a focus on environmental compliance, cost control and preparing the site for eventual handover to the Department of Conservation. Towards the end of the three-year engagement, responsibility for the remaining rehabilitation works was transitioned back to the client.
Carbon Emissions Reduction Strategy and Board Paper
OceanaGold’s carbon emissions work brought together reduction planning and global reporting. EPC developed the first draft of the strategic reduction plan as part of work on the strategy and board paper, including an automated Power BI tool to report Scope 1 and 2 carbon emissions.