BHP

EPC has managed electrical infrastructure projects across BMA operations. Work for BHP also extends to deploying pedestrian detection technology at Western Australia Iron Ore and Copper South Australia (Olympic Dam).

All other projects

BMA

BMA Blackwater Mine

Mine Ramp 32 Power Supply
Mine Ramp 32 Power Supply

Mining at BMA Blackwater’s R32 pit required the relocation of existing electrical infrastructure so operations could continue. The project relocated the 66/6.6 kV power lines and Substation 38.

Communications Tower Install
Communications Tower Install

Advancing mining operations at BMA Blackwater Mine reduced the effectiveness of the Ramp 20 communications tower. A new tower was installed to serve the changing operation.

Water Fill Points
Water Fill Points
Wilpeena and Tannyfoil 66 kV power-line relocations

BMA Blackwater Mine’s Wilpeena and Tannyfoil projects involved relocating 66 kV power lines. EPC managed the electrical work on both relocation projects.

R34 Pit development: new CHPP main water supply pump station

Development of the R34 Pit at BMA Blackwater Mine included a new pump station for the CHPP’s main water supply. EPC managed the electrical work for the pump station project.

BMA Saraji Mine

Saraji CHPP fines-circuit debottlenecking

Bottlenecks in the fines circuit prompted modifications to BMA Saraji’s coal handling and processing plant (CHPP). For Work Pack 4, EPC managed electrical design and installation for several changes to the plant.

BMA Assets and Infrastructure

Rangal Dam pump station upgrade

An obsolete motor control centre on the pontoon at Rangal Dam prompted an upgrade for BMA Assets and Infrastructure. EPC provided electrical project management for the design and installation of a new containerised pump station as its replacement.