Across BHP operations, EPC’s project work covers pedestrian segregation at warehouses, pedestrian detection and forklift fleet management. It also includes civil and electrical infrastructure at BMA, reliability engineering at BMC South Walker Creek Mine, and safety-system transposition and rental equipment transition in Copper South Australia.

All other projects

BMA

BMA Blackwater Mine

Mine Ramp 32 Power Supply
Mine Ramp 32 Power Supply

Mining at BMA Blackwater’s R32 pit required the relocation of existing electrical infrastructure so operations could continue. The project relocated the 66/6.6 kV power lines and Substation 38.

Communications Tower Install
Communications Tower Install

Advancing mining operations at BMA Blackwater Mine reduced the effectiveness of the Ramp 20 communications tower. A new tower was installed to serve the changing operation.

Water Fill Points
Water Fill Points

EPC provided project management for civil work on two water fill points.

Wilpeena and Tannyfoil 66 kV Power-Line Relocations

BMA Blackwater Mine’s Wilpeena and Tannyfoil projects involved relocating 66 kV power lines. EPC managed the electrical work on both relocation projects.

R34 Pit Development: New CHPP Main Water Supply Pump Station

Development of the R34 Pit at BMA Blackwater Mine included a new pump station for the CHPP’s main water supply. EPC managed the electrical work for the pump station project.

Maintenance Contract Review

The existing maintenance contract was reviewed and restructured through business improvement project management. The work sought maintenance cost reductions, fleet reliability improvements and economies in spare parts management.

Catalytic Combustion Agent Fuel Trial

A catalytic combustion agent fuel trial was developed through business improvement project management. The work included a site-specific, Coal Asset and Minerals Australia cost–benefit analysis.

Blackwater Light Vehicle Roads and Remediation

A 2.5 km Light Vehicle Access Road was constructed around the Main Industrial Area, and a new 6.1 km section was constructed along the eastern mining area. Civil construction project management also covered remediation of a tailings dam and sections of the Heavy Vehicle Mine Road following flood damage.

Blackwater Water Management and Civil Works

Water management and mitigation work included pit de-watering and heavy vehicle and light vehicle road repairs and construction. Civil and structural project management also covered planning and development for proposed construction and renovations in the Central Administration Area, as well as CHPP maintenance projects.

Thermal Coal Plant Modification Study

The Thermal Coal Plant was the subject of a mechanical and electrical modification study under EPC’s project management.

Blackwater Roads, Levee and Building Works

Unsealed road construction involved civil and electrical reticulation work. EPC also managed civil levee construction, pit mud removal and civil and structural construction of an industrial building or shed.

IVMS Installation and Rollout

In Vehicle Monitoring Software (IVMS) was installed and rolled out with EPC project management covering technology and communications.

Plant Mechanical and Instrumentation Works

EPC managed mechanical design for rejects bin drainage, instrumentation and mechanical work for reagent dosing, and HVAC design and installation.

Pumping Infrastructure and Water Balance

Pumping infrastructure work covered electrical, mechanical and civil disciplines. Engineering and operational work addressed water balance improvements, with EPC providing project management across both areas.

Equipment Procurement and Commissioning

Equipment procurement and commissioning formed operational and commercial project work managed by EPC.

BMA Saraji Mine

Saraji CHPP Fines-Circuit Debottlenecking

Bottlenecks in the fines circuit prompted modifications to BMA Saraji’s coal handling and processing plant (CHPP). For Work Pack 4, EPC managed electrical design and installation for several changes to the plant.

BMA Peak Downs Mine

Peak Downs Dams and Light Vehicle Access Road

Civil construction project management covered raising the main tailings dam, constructing a new raw water dam and remediating several other raw water dams. The work also included construction of a 3.6 km Light Vehicle Access Road around the northern end of the mine.

Dragline Motivators Study and Trial

A study and trial examined the feasibility and business benefits of walking draglines using a series of mobile generators called Motivators. EPC provided civil construction project management for the work.

Life of Mine Radio Network Strategy

EPC developed a Life of Mine radio network communications strategy, including a constructability plan, through civil construction project management.

BMA Assets and Infrastructure

Rangal Dam Pump Station Upgrade

An obsolete motor control centre on the pontoon at Rangal Dam prompted an upgrade for BMA Assets and Infrastructure. EPC provided electrical project management for the design and installation of a new containerised pump station as its replacement.

BMC

BMC South Walker Creek Mine

South Walker Creek Reliability Engineering

Maintenance reliability engineering covered the CHPP, two draglines and the mobile fleet, including dozers, loaders and ancillary equipment.

Western Australia Iron Ore

Crown InfoLink Forklift Fleet Management

Business readiness and implementation of Crown Forklift InfoLink were managed by EPC. InfoLink is a connected forklift fleet management platform that tracks operator activity, equipment usage, safety events and maintenance needs. Vehicle-mounted hardware, including a 7-inch touchscreen, works with cloud analytics to give managers real-time visibility of forklift and operator performance. The platform is intended to improve productivity and reduce warehouse risk.

Copper South Australia

PHOX Project Inventory Support

Current

EPC is providing inventory support for the PHOX project in Copper South Australia.

Copper South Australia Safety System Transposition

Current

Following the acquisition of Carrapateena and Prominent Hill, the assignment covers transposing Olympic Dam’s safety system to those sites. EPC is providing specialist safety-systems support to compare site practices with the Olympic Dam model, identify gaps and variances, and propose ways to align safety standards, processes, procedures and reporting requirements. The work also covers designing and guiding a Management of Change (MoC) process for adoption through a controlled, transparent process that manages risk and supports compliance.

Olympic Dam Rental Equipment Transition

Current

Rental equipment services at Olympic Dam are moving between hire providers, with EPC providing transition support. The work includes stakeholder interface meetings; identifying, coordinating and tracking actions and transition requirements; strategic and technical advice for equipment transition, operational readiness and emerging issues; and establishing and maintaining a fault and issue register to track, coordinate and report corrective actions through resolution.

It also includes monthly reports on transition status, outstanding actions, fault resolution, risks and recommendations; review, revision and maintenance of the Warehouse Transition Management Plan as requirements, responsibilities and agreed processes change; consolidation of equipment pre-start inspection checklists into standardised site documents; and a close-out report covering equipment status, outstanding faults and actions, residual risks and recommendations, with relevant registers and documentation handed over.