German Creek CHPP circuit-breaker upgrade
At German Creek’s coal handling and preparation plant, the main-substation assignment replaced existing oil-filled circuit breakers. Its scope was the design and installation of two ABB Pass circuit breakers. The work took place at the CHPP main substation of Anglo American’s German Creek operation.
